3 min read
PHMSA Advisory Bulletin Tightens the Screws on DIMP Risk Evaluations
PHMSA just issued ADB-2026-06, an advisory bulletin reminding gas distribution operators of their existing obligations under 49 CFR Part 192, subpart...
3 min read
PHMSA just issued ADB-2026-06, an advisory bulletin reminding gas distribution operators of their existing obligations under 49 CFR Part 192, subpart...
3 min read
Mark the calendar. On Thursday, July 30, 2026, PHMSA is bringing the Gas Pipeline Advisory Committee (GPAC) and the Liquid Pipeline Advisory...
4 min read
Energy Worldnet (EWN) hosted the Compliance Leadership Forum (CLF)—a peer-to-peer space designed for candid, practical conversations about pipeline...
3 min read
If you've been watching the PHMSA rulemaking docket lately, you may have noticed something unusual: a flood of proposed rules, all dropping around...
7 min read
PHMSA's Technical Pipeline Safety Standards Committee, also known as the Gas Pipeline Advisory Committee (GPAC), met on May 28, 2026, to work through...
2 min read
Span of Control - Still a Gray Area, But Getting Clearer
3 min read
Energy Worldnet (EWN) hosted the first-ever Compliance Leadership Forum (CLF)—a peer-to-peer space designed for candid, practical conversations about...
2 min read
The American Society for Mechanical Engineers (ASME) B31Q is a widely used standard in the natural gas industry. It provides pipeline operators with...
3 min read
Ever wondered why backfilling on an active pipeline requires Operator Qualification (OQ), but backhoe maintenance does not? Or why leak investigation...